STEAM SYSTEM INTEGRATION

Completed December 1996

This project involved modifications to the high pressure steam (110 barg @ 510 Deg C) piping at a pulp and paper plant to integrate individual power boilers with steam turbines.  A new steam header was installed together with interconnecting piping and valves.  Steam pressure reducing stations were included in the system to provide MP & LP process steam during turbine outages and vents with silencers for short term paper machine breaks.  Oracle was responsible for the complete design and detailing of the piping (including stress analysis), the off site fabrication of spool sections, delivery, supervision during installation and commissioning as each boiler and T/G set were connected to the system.

 

« Back to Projects

Client:
Location:
Ban Pong, Thailand
Copyright Oracle Engineering | Site Map | Website by RAM Marketing