PIPING UPGRADE

This project involved the installation of a new 7.5MW extraction / condensing T/A set, the up rating of two existing boilers (including detailed thermal and circulation calculations) and an existing 10MW T/A set, the installation of complete new steam reticulation and pressure reducing systems and a new overall power plant microprocessor control system.  The project required a maximum individual plant outage time of 72 hours

 

« Back to Projects

Client:
Location:
Melbourne, Victoria